
AP200 CO
2
/H
2
O Atmospheric Profile System
Route the heater cable to the first intake assembly and cut it to the needed
length. Open the intake assembly cover by gently spreading the tabs on the
lower-front corner and tilting it back. See FIGURE 5-14.
FIGURE 5-14. Tabs for opening intake assembly
Loosen the nut on one of the three cable glands (to avoid the risk of dropping
the nut, do not remove it completely). Insert the cable and tighten the nut.
Connect the red and black wires to the corresponding terminal blocks as shown
in FIGURE 5-15.
FIGURE 5-15. Wiring of heater cable on AP200 intake assembly
30
Comentarios a estos manuales