Campbell-scientific CR1000 Measurement and Control System Manual de usuario Pagina 288

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 588
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 287
Section 8. Operation
288
steady-state conditions so changes in measured voltage are attributable to settling
time rather than changes in pressure. Reviewing the section Programming
(p. 108)
may help in understanding the CRBasic code in the example.
The first six measurements are shown in table First Six Values of Settling-Time
Data
(p. 289). Each trace in figure Settling Time for Pressure Transducer (p. 289)
contains all twenty PT() mV/Volt values (left axis) for a given record number,
along with an average value showing the measurements as percent of final reading
(right axis). The reading has settled to 99.5% of the final value by the fourteenth
measurement, which is contained in variable PT(14). This is suitable accuracy for
the application, so a settling time of 1400 µs is determined to be adequate.
CRBasicExample64. MeasuringSettlingTime
'Program to measure the settling time of a sensor measured with a differential
'voltage measurement
Public PT(20) 'Variable to hold the measurements
DataTable(Settle,True,100)
Sample(20,PT(),IEEE4)
EndTable
BeginProg
Scan(1,Sec,3,0)
BrFull(PT(1),1,mV7_5,1,Vx1,1,2500,True,True,100,250,1.0,0)
BrFull(PT(2),1,mV7_5,1,Vx1,1,2500,True,True,200,250,1.0,0)
BrFull(PT(3),1,mV7_5,1,Vx1,1,2500,True,True,300,250,1.0,0)
BrFull(PT(4),1,mV7_5,1,Vx1,1,2500,True,True,400,250,1.0,0)
BrFull(PT(5),1,mV7_5,1,Vx1,1,2500,True,True,500,250,1.0,0)
BrFull(PT(6),1,mV7_5,1,Vx1,1,2500,True,True,600,250,1.0,0)
BrFull(PT(7),1,mV7_5,1,Vx1,1,2500,True,True,700,250,1.0,0)
BrFull(PT(8),1,mV7_5,1,Vx1,1,2500,True,True,800,250,1.0,0)
BrFull(PT(9),1,mV7_5,1,Vx1,1,2500,True,True,900,250,1.0,0)
BrFull(PT(10),1,mV7_5,1,Vx1,1,2500,True,True,1000,250,1.0,0)
BrFull(PT(11),1,mV7_5,1,Vx1,1,2500,True,True,1100,250,1.0,0)
BrFull(PT(12),1,mV7_5,1,Vx1,1,2500,True,True,1200,250,1.0,0)
BrFull(PT(13),1,mV7_5,1,Vx1,1,2500,True,True,1300,250,1.0,0)
BrFull(PT(14),1,mV7_5,1,Vx1,1,2500,True,True,1400,250,1.0,0)
BrFull(PT(15),1,mV7_5,1,Vx1,1,2500,True,True,1500,250,1.0,0)
BrFull(PT(16),1,mV7_5,1,Vx1,1,2500,True,True,1600,250,1.0,0)
BrFull(PT(17),1,mV7_5,1,Vx1,1,2500,True,True,1700,250,1.0,0)
BrFull(PT(18),1,mV7_5,1,Vx1,1,2500,True,True,1800,250,1.0,0)
BrFull(PT(19),1,mV7_5,1,Vx1,1,2500,True,True,1900,250,1.0,0)
BrFull(PT(20),1,mV7_5,1,Vx1,1,2500,True,True,2000,250,1.0,0)
CallTable Settle
NextScan
EndProg
Vista de pagina 287
1 2 ... 283 284 285 286 287 288 289 290 291 292 293 ... 587 588

Comentarios a estos manuales

Sin comentarios