Campbell-scientific 109-L Temperature Probe Manual de usuario Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 30
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
Model 109 Temperature Probe
8. Operation
8.1 Sensor Schematic
FIGURE 8-1. 109 Thermistor Probe Schematic
8.2 Measurement and Output Linearization
CRBasic instruction Therm109() measures the 109 probe thermistor and
automatically converts the result to temperature. With reference to the
previous FIGURE 8-1, 109 thermistor probe schematic, a precise excitation
voltage is applied at the Vx line and the voltage drop across the 24.9 kΩ
resistor is measured at the Vs line.
The ratio of measured voltage (Vs) to excitation voltage (Vx) is related to
thermistor resistance (Rs) and the 24.9 kΩ bridge resistor as described in the
following equations:
Vs/Vx = 24900 Ω / (Rs + 24900 Ω)
Solving for Rs:
Rs + 24900 Ω = 24900 Ω (Vx/Vs)
Rs = 24900 Ω ((Vx/Vs) – 1)
The relationship of Rs to temperature is tabulated in Appendix C, Thermistor
Resistance and Temperature, but is calculated by Therm109() using the
Steinhart-Hart equation, described as follows:
T = 1 / ((A + (B ln(Rs))) + C ((ln(Rs)))^3)) 273.15
where:
T = temperature in Celsius
A
1
= 1.129241E–3
B
1
= 2.341077E–4
C
1
= 8.775468E–8
1
Coefficients provided by Measurement Specialties™.
10
Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 29 30

Comentarios a estos manuales

Sin comentarios