Campbell-scientific Sentek EasyAG Installation Guide v 3.0 Manual de usuario Pagina 24

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 39
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 23
Installing EasyAG 50 probes
Copyright © 1991 – 2003 Sent ek Pt y Lt d All rights reserved Page 21
5. Feed the cable through the FairRite bead and the cable gland i nto the top cap. It is simpler to push
the cable through the cable gland at this point than when the access tube is installed in the ground.
6. Remove the stabilization plate wing nuts.
7. Remove the stabilization plate pins and separate the 2 halves of the stabilization plate and remove
them.
8. Continue inserting the probe into the ground with gentle blows of the sledgehammer using the
EasyAG 50 dolly, until the base of the top cap is level with the ground. This will place the top sensor
at 10 cm (3.9 inches) below the ground surface. Remove the EasyAG 50 dolly.
Vista de pagina 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 38 39

Comentarios a estos manuales

Sin comentarios