Campbell-scientific CS300 Silicon Pyranometer Manual de usuario Pagina 14

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 28
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 13
CS300 Pyranometer
7.2 Mounting to an Instrument Mount
7.2.1 Required Tools
Tools required for installation on a tripod or tower:
Small and medium Phillips screwdrivers
1/2 in open end wrench for CM225 or 015ARM
Tape measure
UV-resistant cable ties
Side-cut pliers
Compass
Step ladder
7.2.2 Mounting Procedure
7.2.2.1 CM225 Solar Sensor Mounting Stand
1. If mounting the CM225 directly to a mast, place the CM225’s U-bolt in
the side holes and secure the CM225 to the mast by tightening the U-bolt
nuts.
2. If mounting a CM225 on a CM200-series crossarm, mount the crossarm to
the tripod or tower. Then place the CM225’s U-bolt in the bottom holes
and secure the CM225 to the crossarm by tightening the U-bolt nuts.
CM225 Stand
CM225 Stand
CM200-Series Crossarm
U-bolt Nuts
6
Vista de pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 27 28

Comentarios a estos manuales

Sin comentarios