Campbell-scientific UT20 and UT30 Tower-based Weather Stations Manual de usuario Pagina 21

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 74
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 20
UT20 and UT30 Tower-based Weather Stations
7-3. Align each J-bolt so the angled portion is pointing outward and
tighten the lower nuts to secure the assembly.
FIGURE 7-3. J-bolt template assembly
3. Construct a concrete form as shown in FIGURE 7-4 out of 2-inch x 4-inch
lumber, 24 inches square (inside dimensions). Construct the 1-inch x 2-
inch template frame and set it aside. Center the form over the hole and
drive a stake centered along the outside edge of each side. Level the form
by driving nails through the stakes and into the form while holding the
form level.
FIGURE 7-4. Positioning the J-bolt in concrete
4. Position the J-bolt template as shown in FIGURE 7-3. The top of each
bolt will be 3.00 inches ±0.25 inches above the level of the form. Level
the tops of the J-bolts in all directions using a small level and secure the
11
Vista de pagina 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 73 74

Comentarios a estos manuales

Sin comentarios