Appendix H. Tripod CS110 and StrikeGuard Site
Power and communication cables should be run down the equator side of the
mast and under the enclosure as shown. Wire-tie all cables into place so they
don’t move with the wind.
H.1.2 Determination of Csite
Surface mounted upward facing CS110: SN1022 with Mparallel_plate = 88.31.
CM10 Tripod Mounted StrikeGuard and CS110: SN1023 with Mparallel_plate =
81.77.
Each CS110 recorded one minute averages of 1 second measurements of electric
field data for the same one hour time period from 3 AM to 4 AM on August 11,
2005. The data from both units is plotted in Figure H-6. A best-fit line was
computed. The linear regression yields a Csite = 0.108 for the Tripod CS110 and
StrikeGuard Site.
Site Correction for CS110/StrikeGuard on CM10 Tripod August 11, 2005
1 minute average of 1 second samples
Results indicate Csite = 0.108
y = 0.1079x - 64.062
R
2
= 0.9994
-4000
-2000
0
2000
4000
6000
8000
10000
-40000 -20000 0 20000 40000 60000 80000 100000
Uncorrected Electric Field (volts/meter) for CM10 tripod mounted StrikeGuard & 2 Meter CS110
SN1023: Mparallel_plate = 81.77 Volt/meter*millivolt
Electric field (volts/meter) for upward facing CS110 SN1022:
Mparallel_plate = 88.31 Volt/meter*millivolt
StrikeGuard Uncorrected E_field 1_Min_Avg volts/m
Linear (StrikeGuard Uncorrected E_field 1_Min_Avg volts/m)
FIGURE H-6. Determination of Csite
H-7